Leave Your Message
60kW Dual Gun Wall Mounted DC Charger for Simultaneous EV Fleet Charging
Wall-Mounted DC Charger
Products Categories
Featured Products

60kW Dual Gun Wall Mounted DC Charger for Simultaneous EV Fleet Charging

Dual-gun 60kW wall-mounted DC charger for shared fleet, workplace, and commercial parking applications.
  • Product category DC electric vehicle charging equipment
  • Rated charging power 60 kW
  • Deployment type Wall mounted dual gun
  • Connector or output Dual gun output
  • Primary use Shared fleet and workplace charging
  • Image set Six product reference images supplied for this product series
  • Configuration note Final voltage, current, cable length, protocol, enclosure and certification package are confirmed with the project specification

product detail

Product Overview

60kW Dual Gun Wall Mounted DC Charger for Simultaneous EV Fleet Charging is a 60 kW dual-gun wall-mounted DC fast charger developed for professional EV infrastructure projects. The equipment is intended for shared parking, fleet depots, workplaces, service centers, and locations needing two charging outputs. The selected output is dual-gun output, while the final electrical design is confirmed against the vehicle population, site supply, cable routing, local code, and operating model. This listing describes the commercial use case and configurable product architecture without assuming project details that have not been specified.

The product is positioned for buyers who need a clear path from site survey to commissioning. Power rating, enclosure arrangement, connector choice, cable length, user interface, payment method, networking, and service access can be reviewed during technical clarification. The images are reference images for the product family. Exact appearance, branding, screen layout, and accessory selection should be checked against the final quotation and approved drawing.

Core Advantages

The 60 kW rating gives project planners a defined capacity for charger allocation and electrical planning. For a dual-gun wall-mounted DC fast charger, the most useful advantage is predictable deployment: the site team can size feeders, protection, parking layout, cable reach, and operating shifts around a stated output. The floor, wall, advertising, or split arrangement can be selected to suit the physical constraints of the site.

Power and Charging Planning

A 60 kW charger should be evaluated together with vehicle battery voltage, charging curve, arrival state of charge, dwell time, and the number of vehicles using the site. Rated power is not the same as guaranteed vehicle power in every session. A sound deployment plan therefore checks the vehicle communication standard, site demand profile, upstream capacity, cable position, and thermal conditions before final purchase. This approach helps distributors and charging operators present an accurate offer rather than an over-promised charging time.

Connector and Market Fit

This configuration uses dual-gun output as the requested output reference. Connector selection should match the target market and vehicle fleet. Buyers should confirm inlet compatibility, pin assignment, locking requirements, cable length, current rating, and regional installation rules. If a project serves mixed fleets, a multi-standard or separate-output strategy may be more suitable than choosing one connector by assumption. The final connector package is recorded in the technical specification and should be approved before production.

Site Integration

The product can be reviewed as part of a complete charging site rather than as an isolated cabinet. Planning normally covers incoming power, protective devices, earthing, surge protection, communications, concrete or wall structure, drainage, ventilation or cooling clearance, vehicle movement, accessibility, lighting, and maintenance access. For shared parking, fleet depots, workplaces, service centers, and locations needing two charging outputs, the operating team should also define opening hours, user authentication, payment or billing, signage, emergency procedures, and spare-parts responsibility.

Commercial Deployment

Distributors, CPOs, EPC contractors, installers, fleet operators, and site owners can use this product family in different ways. A distributor may configure it around a regional connector and service package. An EPC contractor may specify it with civil works, switchgear, monitoring, and commissioning. A fleet operator may evaluate energy cost, shift timing, uptime, and vehicle turnaround. A site owner may focus on footprint, customer experience, visibility, and future expansion. The same rated charger should therefore be quoted with the buyer’s operating objective clearly stated.

Control, Networking, and Data

Control and communication requirements should be confirmed at project stage. Typical questions include whether the station works as a local standalone unit, connects to a charge point management system, supports remote monitoring, records session data, or integrates with an energy management platform. Where OCPP, ISO 15118, V2G, Plug and Charge, cellular, Ethernet, Wi-Fi, or payment functions are requested, the exact supported version and regional availability must be verified in the approved specification. This listing does not treat an unconfirmed protocol as included by default.

Thermal and Environmental Considerations

Charging performance depends on ambient temperature, airflow, installation clearance, cable handling, dust, moisture, altitude, and duty cycle. High-power and split-system projects need a thermal review that considers power modules, cable temperature, cabinet location, satellite distance, and service access. Buyers should confirm the target IP rating, operating temperature range, corrosion environment, noise requirement, and cleaning plan. For outdoor sites, the civil design should prevent standing water and protect the equipment from vehicle impact.

Space and Layout

For a wall-mounted installation, structural loading, anchor selection, cable management, vehicle clearance, and service access are central. A dual-gun unit also requires a clear operating rule for power sharing and two-vehicle access. The final mounting surface and cable route should be checked by the installer before delivery.

Safety and Installation

Installation should be completed by qualified personnel under the applicable local electrical and construction requirements. The commissioning plan normally includes insulation and continuity checks, protective-device verification, emergency-stop checks, connector inspection, communication tests, load tests, signage, and operator training. The product should not be energized before the installation team confirms that the supply, grounding, protection, and enclosure are suitable. Any requested certification or market approval should be listed as a project deliverable and verified for the exact model and configuration.

Maintenance and Serviceability

Routine care supports dependable operation. A service plan can include visual inspection, connector and cable checks, cleaning, ventilation or cooling inspection, fastener review, firmware or software management where applicable, event-log review, and periodic electrical testing. Operators should record fault codes, environmental conditions, vehicle information, and corrective actions. Distributors should define spare parts, escalation contacts, response times, and warranty conditions before commissioning so that the customer understands the support path.

Configuration Checklist

Before order confirmation, the buyer should provide target country, installation site, input voltage and frequency, rated power, connector standard, cable length, number of outputs, mounting or cabinet arrangement, network method, payment requirement, language, branding, display requirement, environmental conditions, delivery terms, and requested documentation. For BESS products, battery capacity, usable energy, operating window, fire protection, and energy-management interfaces should be added. For mobile products, transport and deployment conditions should also be included.

Application Scenarios

The dual-gun wall-mounted DC fast charger is suitable for project discussions covering shared parking, fleet depots, workplaces, service centers, and locations needing two charging outputs. In a fleet depot, the focus is vehicle turnaround and repeatable daily scheduling. At a highway hub, the focus is traffic flow, uptime, wayfinding, and service access. In a workplace or garage, footprint and installation simplicity may be more important. At a BESS or mobile site, energy availability and resilience may lead the decision. Each scenario benefits from a short site survey and a written configuration record.

After-sales Advantages

After-sales support is most effective when the handover package is complete. Recommended documents include the approved specification, installation guide, wiring information, operating instructions, commissioning record, maintenance schedule, spare-parts list, warranty terms, and service contact route. Remote support may use photographs, event logs, meter readings, and a description of the vehicle or site condition. Local service capability, replacement strategy, and training can be agreed according to the distributor or project requirement.

Buyer Questions and Answers

What vehicles can use this charger? Vehicles must match the selected dual-gun output and communication requirements. Is the rated power delivered to every vehicle? The result depends on vehicle acceptance, battery voltage, state of charge, temperature, and any power-sharing rule. Can it be used outdoors? Outdoor use depends on the approved enclosure, civil works, environmental conditions, and local installation review. Can the design be customized? Connector, cable, color, branding, networking, display, mounting, and project documentation can be reviewed during configuration. What information is needed for a quotation? Site country, power supply, target vehicles, output standard, quantity, installation type, operating schedule, and delivery requirements are the practical starting points.

Search Focus 1: 60kW Dual Gun Wall Mounted DC Charger for Simultaneous EV Fleet Charging

This search phrase describes the practical buying context for the product. It connects rated power, charger form, connector or system architecture, and the intended application without claiming an unsupported performance result. Buyers can use it when comparing suppliers, preparing an RFQ, or building a site specification. The final technical sheet remains the controlling document for voltage, current, efficiency, protection, protocol, certification, dimensions, weight, and delivery scope.

Search Focus 2: 60kW Dual Gun Wall Mounted DC Charger Designed for Simultaneous EV Fleet Charging

This search phrase describes the practical buying context for the product. It connects rated power, charger form, connector or system architecture, and the intended application without claiming an unsupported performance result. Buyers can use it when comparing suppliers, preparing an RFQ, or building a site specification. The final technical sheet remains the controlling document for voltage, current, efficiency, protection, protocol, certification, dimensions, weight, and delivery scope.

Search Focus 3: 60kW dual-gun output dual-gun wall-mounted DC fast charger for fleet and public charging

This search phrase describes the practical buying context for the product. It connects rated power, charger form, connector or system architecture, and the intended application without claiming an unsupported performance result. Buyers can use it when comparing suppliers, preparing an RFQ, or building a site specification. The final technical sheet remains the controlling document for voltage, current, efficiency, protection, protocol, certification, dimensions, weight, and delivery scope.

Search Focus 4: Commercial 60kW electric vehicle charging solution for shared parking, fleet depots, workplaces, service centers, and locations needing two charging outputs

This search phrase describes the practical buying context for the product. It connects rated power, charger form, connector or system architecture, and the intended application without claiming an unsupported performance result. Buyers can use it when comparing suppliers, preparing an RFQ, or building a site specification. The final technical sheet remains the controlling document for voltage, current, efficiency, protection, protocol, certification, dimensions, weight, and delivery scope.

Search Focus 5: B2B dual-gun wall-mounted DC fast charger with a project-defined dual-gun output configuration

This search phrase describes the practical buying context for the product. It connects rated power, charger form, connector or system architecture, and the intended application without claiming an unsupported performance result. Buyers can use it when comparing suppliers, preparing an RFQ, or building a site specification. The final technical sheet remains the controlling document for voltage, current, efficiency, protection, protocol, certification, dimensions, weight, and delivery scope.

For installers, the approved drawing should be treated as the working reference. It should show the equipment position, cable routes, access zones, emergency controls, protective devices, earthing, network route, drainage, impact protection, and signage. Any difference between the proposed installation and the drawing should be resolved before energization. The 60 kW dual-gun wall-mounted DC fast charger remains the reference configuration for this listing, with dual-gun output recorded for the requested application.

For operators, the handover should include a practical operating routine. Staff should know how to inspect connectors, recognize a fault, isolate equipment safely, report a damaged cable, and contact support. Session records and maintenance notes create useful evidence for diagnosing recurring issues and planning future capacity. The 60 kW dual-gun wall-mounted DC fast charger remains the reference configuration for this listing, with dual-gun output recorded for the requested application.

For fleet owners, charging should be measured against the route and shift plan. A charger that fits the vehicle and site but is placed outside the useful dwell window may not deliver the expected operational value. Charging windows, battery state of charge, seasonal conditions, and queue behavior should be reviewed after commissioning. The 60 kW dual-gun wall-mounted DC fast charger remains the reference configuration for this listing, with dual-gun output recorded for the requested application.

For BESS projects, energy storage is part of the electrical system, not simply an extra battery attached to a charger. The project team should establish how the battery is charged, when it discharges, how reserve energy is protected, what happens during a grid outage, and how safety events are handled. These rules should be recorded in the control and commissioning documents. The 60 kW dual-gun wall-mounted DC fast charger remains the reference configuration for this listing, with dual-gun output recorded for the requested application.

For public sites, user confidence depends on clear instructions, reliable cable handling, lighting, accessibility, payment or authentication, and a visible support channel. A clean installation and a simple user journey can be as important as the equipment specification when a site competes for repeat charging traffic. The 60 kW dual-gun wall-mounted DC fast charger remains the reference configuration for this listing, with dual-gun output recorded for the requested application.

For distributors, a well-defined configuration reduces quotation errors. Keep the title, product image set, connector, power, category, SEO description, and technical parameter table aligned. When an option is not confirmed, state that it is project-dependent instead of presenting it as a standard inclusion. The 60 kW dual-gun wall-mounted DC fast charger remains the reference configuration for this listing, with dual-gun output recorded for the requested application.

A professional charging project is rarely decided by the nameplate power alone. The right selection balances electrical capacity, vehicle compatibility, operating time, space, climate, service access, and total ownership requirements. This product family is intended to make that discussion concrete by starting with a clear power class and a defined physical arrangement. The 60 kW dual-gun wall-mounted DC fast charger remains the reference configuration for this listing, with dual-gun output recorded for the requested application.

For procurement teams, the strongest comparison is a like-for-like matrix. Record the same fields for every supplier: output power, connector, input requirement, cable length, enclosure, cooling method, communication, protections, dimensions, service access, documentation, warranty, spare parts, lead time, and installation responsibility. This avoids comparing a headline number from one supplier with a complete delivered system from another. The 60 kW dual-gun wall-mounted DC fast charger remains the reference configuration for this listing, with dual-gun output recorded for the requested application.

For installers, the approved drawing should be treated as the working reference. It should show the equipment position, cable routes, access zones, emergency controls, protective devices, earthing, network route, drainage, impact protection, and signage. Any difference between the proposed installation and the drawing should be resolved before energization. The 60 kW dual-gun wall-mounted DC fast charger remains the reference configuration for this listing, with dual-gun output recorded for the requested application.

For operators, the handover should include a practical operating routine. Staff should know how to inspect connectors, recognize a fault, isolate equipment safely, report a damaged cable, and contact support. Session records and maintenance notes create useful evidence for diagnosing recurring issues and planning future capacity. The 60 kW dual-gun wall-mounted DC fast charger remains the reference configuration for this listing, with dual-gun output recorded for the requested application.

For fleet owners, charging should be measured against the route and shift plan. A charger that fits the vehicle and site but is placed outside the useful dwell window may not deliver the expected operational value. Charging windows, battery state of charge, seasonal conditions, and queue behavior should be reviewed after commissioning. The 60 kW dual-gun wall-mounted DC fast charger remains the reference configuration for this listing, with dual-gun output recorded for the requested application.

For BESS projects, energy storage is part of the electrical system, not simply an extra battery attached to a charger. The project team should establish how the battery is charged, when it discharges, how reserve energy is protected, what happens during a grid outage, and how safety events are handled. These rules should be recorded in the control and commissioning documents. The 60 kW dual-gun wall-mounted DC fast charger remains the reference configuration for this listing, with dual-gun output recorded for the requested application.

MAKE AN FREE CONSULTANT

Your Name*

Phone Number

Country

Remarks*

rest